Typical Project
Westward Expansion of West Lake Project in Hangzhou
Equipment Type: Grinder
The "Westward Expansion of West Lake" project represents the largest ecological restoration effort in the western region of West Lake, Hangzhou. The design of the fully buried, unmanned pump stations seamlessly integrates with the scenic landscape along the causeway. This project pioneered the introduction of grinder screens in China and set a new direction for the construction of pump stations in the country.
WWTP in the Macao Cross-Border Industrial Zone
Equipment Type: Bandscreen/Drum Screen/Vertical Rake Screen
The WWTP in Macao Crossborder Industrial Zone was established in 2006 and commenced operations in 2009, utilizing the MBR process with a design capacity of 12000m3/d. IVY has participated in multiple phases of this project, supplying 4 sets of internal flow bandscreens, 2 sets of drum screens, 1 set of Grinder, and 2 sets of Vertical Spiral Screens.

Hangzhou Qige WWTP
Equipment Type: Non-Metallic gates
The Hangzhou Qige WWTP is the largest urban domestic sewage treatment plant in Zhejiang Province.The upgrade project, started in 2015,  IVY was honored to provide over 100 sets of various types of non-metallic gates and have been in normal operation for over 8 years.

Shenzhen Shekou WWTP
Equipment Type: Bandscreen
The Shenzhen Shekou Water Purification Plant upgrade project employs the MBR process, with a near-term design capacity of 50000m3/d and a long-term design capacity of 100000m3/d. IVY provided 2 sets of 5mm fine bandscreens (1 in use and 1 standby) and 4 sets of 1mm fine bandscreens (2 in use and 2 standby) in the project .

Shanghai World Expo Stormwater & Wastewater Pump Station
Equipment Type: Grinder
The Shanghai World Expo's Pudong Park drainage system included the Puming, Houtan, Naguan, and Nanmatou pump stations. These primary stormwater and wastewater pump stations were integral to the 2010 Shanghai Expo.

Beijing Olympic Chengfu & Datun Road Tunnel Pump Station
Equipment Type: Grinder
The Chengfu and Datun Road tunnel pump station were critical infrastructure projects for the central area during the 2008 Beijing Olympics. These pump stations served as key nodes for stormwater discharge during the Olympic and marked the first use of fully buried pump stations in Beijing.

Chengdong WWTP in Guoyang,Anhui
Equipment Type: Bandscreen
The Phase I renovation of the Chengdong WWTP in Guoyang, Anhui, is designed for a capacity of 60,000 m3/d (peak flow rate of 78,000 m3/d). After extensive evaluation, the plant adopted two sets of 3mm BandScreen plates to replace the traditional screens.
NO.2 Stormwater Pump Station in Wufeng, Shanghai
Equipment Type: Non-Metallic gates
Located in the advanced manufacturing area of the Lingang New Area, the No.2 Stormwater Pump Station in Wufeng handles flood control, sewage interception, and initial rainwater retention functions. IVY supplied 8 sets of electric non-metallic gates for this project.
IVY CANADA ENVIROTECH
Address: L8,229 Tiyuchang Rd, Hangzhou, China   Postcode: 310003 Telephone: +86(571) 85779681 / 85779683 Fax: +86(571) 85779682
Mail:info@ivycanada.cn

IVY  CANADA  ENVIROTECH
A  Specialized  Environmental   Solution  Supplier
Quick Navigation:
· About Us
· Main Products
· Typical Project
· News
· Contact Us